What is an operation and maintenance manual?

An operation and maintenance manual, or O&M manual, is the compiled record of how a completed asset and its installed equipment are operated, serviced, and repaired, handed to the owner at practical completion. It is written in the final weeks of a project and read for the next thirty years.

The manual arrives with the rest of the handover record: the as-constructed drawings, the warranties, and the commissioning certificates. Everything the owner needs to run the asset is either in it or referenced from it.

Also called: O&M manual · operations and maintenance manual · building manual · handover manual

fig. 02 · in practice

What the manual holds, and when it lands.

The manual is assembled through construction and commissioning, then delivered at handover. Accepting it is usually a contractual condition of practical completion, so it is compiled under pressure at the end of a project and consumed calmly for decades afterwards.

Maintenance teams, operators, repair contractors, auditors, and the designers of the next upgrade all work from the same manual. Each of them arrives looking for one plant item, not for a thousand-page volume.

See how handover works
Typical contents8 parts
  • 01
    System descriptions

    How each installed system is meant to run, its design intent, and its normal operating parameters.

  • 02
    Manufacturer literature

    Product data sheets, equipment schedules, spare parts lists, and the supplier's own servicing instructions.

  • 03
    Maintenance schedules

    What to service, at what interval, and to what standard, for every item of plant on the asset.

  • 04
    Test and commissioning records

    The certificates showing each system was tested, balanced, and set to work before it was accepted.

  • 05
    Warranties and guarantees

    What is covered, for how long, and who the claim goes to when a component fails inside its term.

  • 06
    Contacts

    The installers, suppliers, and subcontractors behind each system, so a fault has somewhere to go.

  • 07
    Drawings and schematics

    The as-constructed drawings, single-line diagrams, and schematics the rest of the manual refers to.

  • 08
    Statutory certificates

    The compliance and regulatory evidence the owner has to produce on request for the life of the asset.

Why manuals decay once the project team has gone.

A manual delivered as a fixed set of files has no mechanism for staying true. Six things pull it away from the asset it describes.

No owner after handover

The contractor's obligation ends at delivery, and unless the manual is booked into a register it has nobody accountable for keeping it current.

Delivered outside control

A folder of PDFs or a shelf of lever-arch files sits outside revision control, so a correction has nowhere to land and no version is ever marked current.

The plant changes

Equipment is replaced, upgraded, and rerouted across decades of operation, while the manual keeps describing what was installed on day one.

The drawings drift

Drawings embedded in the manual are frozen copies. The controlled drawing record moves on with each revision, and the two stop agreeing.

Too big to search

A manual runs to thousands of pages across scanned appendices, so the answer is in there somewhere and nobody can reach it in time.

The contacts age out

The installer's phone number is the first thing to expire, and by the time a fault needs it the company has been bought or wound up.

fig. 03 · how Lunr handles it

The manual belongs in the register, beside the drawings.

Lunr holds the manual as a controlled document in the same register as the drawings it refers to, so it has an owner, a current version, and a revision history. A correction made five years into operation has somewhere to land.

  • Hold the manual in the same register as the drawings, under revision control, with one version marked current.
  • Validate the handover package against a manifest, so a missing appendix is caught on upload rather than in an audit.
  • Search the text inside the manual with XRAY, including scanned appendices, so a part number or contractor name is findable.
  • Tag each document against the asset hierarchy, so a maintainer reaches the manual from the plant item it describes.
  • Keep the manual and the as-constructed drawings in one record, each carrying its own revision.
  • When the project closes, the record stays with the asset rather than with the delivery team.

manifest validation · revision control · xray full-text search · asset hierarchy tagging · the record stays with the asset

See how XRAY searches inside a scanned manual
fig. 05 · questions

Questions about operation and maintenance manuals.

01
What is included in an operation and maintenance manual?
A typical manual holds system descriptions and design intent, manufacturer literature and spare parts lists, maintenance schedules and servicing intervals, test and commissioning certificates, warranties and their expiry dates, a contact list for installers and suppliers, statutory and compliance certificates, and the as-constructed drawings and schematics the rest of the manual refers to. The exact contents are set by the contract, so the client's requirements at practical completion define the list.
02
When is an O&M manual produced?
It is assembled through construction and commissioning, then delivered at handover. Acceptance of the manual is usually a contractual condition of practical completion or of final payment, which is why it is compiled under time pressure at the end of a project. It arrives alongside the as-constructed drawings, the warranties, and the rest of the handover documentation.
03
Who uses an O&M manual, and for how long?
The maintenance and facilities team use it from day one and every day after. Operators use it to run plant within its design parameters, contractors use it when they arrive to repair something, auditors and regulators use it as compliance evidence, and designers use it as the starting point for the next refurbishment or decommissioning. The manual is written in the last weeks of a project and read for the next thirty years.
04
What is the difference between an O&M manual and as-constructed drawings?
As-constructed drawings show what was actually built or installed. The O&M manual explains how to run and maintain it, and refers to those drawings throughout. They are two parts of the same handover record and are only useful together, which is why they belong in the same controlled register rather than in a drawing system and a separate folder of PDFs.
05
Why do O&M manuals go out of date?
Because nothing owns them after handover. The manual is delivered as a fixed set of files, outside revision control, so a correction has nowhere to land. Plant is replaced and reconfigured over the operating life while the manual keeps describing the original installation, and the drawings bound into it drift away from the controlled drawing record. Booking the manual into the same register as the drawings gives it an owner, a current version, and a revision history.
fig. 06 · get started

Take a manual that stays true to the asset.

Book a walkthrough and watch a handover package validate against a manifest, land in the register beside the drawings, and stay searchable to the page.

10M+ documents under management · Hosted in Australia and the US · SAML · Full audit trail · Export anytime

entity
Lunr Labs Pty Ltd
location
Melbourne AU
workspace
documents.lunr.app
rev
2026